Showing posts with label Cold lay-up. Show all posts
Showing posts with label Cold lay-up. Show all posts

Tuesday, December 17, 2013

Hot lay-up, Cold lay-up

Hot lay-up
Hot lay-up condition, the machinery is kept in operation for the sake of fast re-commissioning, but measures
may be taken to reduce various operational costs.

Cold lay-up
In cold lay-up condition the machinery is taken out of service and the vessel is kept “electrically dead” with the
exception of emergency power.